The Szczecin-Goleniów Airport required a durable solution to address the extensive cracking on a 2.5 km section of its runway and adjacent taxiway. The existing pavement suffered significant damage, prompting the airport authorities to seek a long-term, cost-effective solution. Budimex S.A., the general contractor, collaborated with us to implement Mesh Track® as the primary reinforcement to prevent reflective cracking.