The challenge
“To meet the scheduled completion date, we made the decision to finish the job in one massive pour instead of multiple 20,000 ft² placements, which is a more typical approach. Finishing operations involved nearly 33 consecutive hours of placing, raking, leveling, troweling, and sawing. To get this done, many staff, equipment, materials and vehicles were at the ground, at all times.”
The solution
“To make the project run as smooth as possible, we decided to use steel fiber concrete reinforcement. Using Dramix® helped us achieve the required structural yield of 2% and thickness of 8”, and we didn’t have to put extra time and materials into placing rebar. We had more space to move around and ultimately needed fewer men to complete the job. All of these benefits resulted in a reduced project cost of approximately 15%."
Bekaert provided four conveyor belts for the project to add the fibers to the concrete at the jobsite. This way we were in full control over the quality of the concrete mix at all times. All four belts were working continuously all through the project. We were also very pleased with the design support we received from Bekaert; we will definitely be working with them again for our future projects.”